The work was performed using 6 excavators ranging in size from 30 tonne to 160 tonne with grapple shears and magnet attachments The 160t and 45t excavators carried out the deconstruction as primary and secondary breakers and the 35t excavators were used to process and load out material Dust management was a major concern on the site and Major Projects Group employed a range of dust